Construction industry: the bill was missed at the end of the session. Basically, this bid is going to be opened higher and lower. Will this divergent expectation lead to a big retreat of the high-level collective? Let's leave this expectation first. Of course, everything is not absolute. If it is not low, it will be more than expected. Anyway, make more plans,Fudan Fuhua (3, Quantum Technology)Huifa Food (4, Food)
Zhuo Lang Intelligent (6 days and 5 boards, textile equipment)Arrange the disk relative to the body core:Rishang Group (12 days and 11 boards, car+metaphysics+make-up)
Huifa Food (4, Food)Wuzhou Spring Festival (7 boards in 10 days, robot)Easyhome (5 days, 4 boards, retail)
Strategy guide 12-14
Strategy guide 12-14
Strategy guide 12-14
Strategy guide
12-14